Nagaland may face winter power deficits despite a projected energy surplus of 9.5% and peak power surplus of 3.7%
DIMAPUR — Nagaland may face power deficits during the winter months despite a projected annual energy surplus of 9.5% and a peak power surplus of 3.7% for the financial year 2026-27, according to the Load Generation Balance Report (LGBR) 2026-27 of the Central Electricity Authority (CEA) under the Ministry of Power.
The report estimated Nagaland’s annual energy requirement at 1,107 million units (MU) against an anticipated availability of 1,212 MU, resulting in a surplus of 105 MU.
The state’s peak power demand is projected at 216 megawatts (MW) against an anticipated availability of 224 MW, resulting in a surplus of 8 MW.
However, despite the projected annual surplus, Nagaland is expected to face an energy deficit for four consecutive months from December 2026 to March 2027 and a peak power deficit for three months from November 2026 to January 2027.
As per the month-wise projections, the highest energy surplus of 29.3% each was anticipated in August and September 2026, followed by 24.4% in July, 22.1% in October and 20.3% in June.
The highest monthly energy deficit is anticipated in December 2026 at 16.5%, followed by 9.3% in January, 7.3% in February and 1.8% in March 2027.
Also read: Nagaland raises INR 450 crore through RBI auction
Study identifies landslide-prone zones in Nagaland
In terms of peak power, the highest deficit of 10.1% is projected for November 2026, followed by 2.7% in December and 6.7% in January 2027.
The state’s highest monthly peak power demand of 216 MW is anticipated in November 2026, against an estimated availability of 194 MW, resulting in a deficit of 22 MW.
During the financial year 2025-26, Nagaland met its entire energy requirement of 996 MU. However, the state recorded a peak power deficit of 5.6%, with only 191 MW met against a peak demand of 202 MW.
The anticipated energy requirement of 1,107 MU for 2026-27 represents an increase of approximately 11.1% over the previous financial year, while peak power demand is projected to increase by about 6.9%.
The LGBR for 2025-26 had projected Nagaland’s energy requirement at 1,073 MU and availability at 1,128 MU. However, the actual energy requirement and supply stood at 996 MU each.
Similarly, against the projected peak demand of 206 MW and availability of 207 MW, the actual peak demand and peak met stood at 202 MW and 191 MW, respectively.